| CONTRACTOR: | Ward Electric |
| # OF JOURNEYMAN LINEMAN: | 2 |
| TYPE OF WORK: | Transmission |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | 5-10’s |
| OVERTIME: | possible |
| REQUIREMENTS: | CDL-A |
| CALL # | 6390 |
| CONTRACTOR: | Intren |
| # OF JOURNEYMAN LINEMAN: | 1 |
| TYPE OF WORK: | Outside Construction |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | 40 Hours |
| OVERTIME: | Possible |
| REQUIREMENTS: | CDL-A, Proper I-9 Identification, General Foreman Experience, Subject to Interview, 4-5 week duration |
| CALL # | 6465 |
| CONTRACTOR: | Sub Surface |
| # OF Groundman | 2 |
| TYPE OF WORK: | Underground |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | 4-10’s |
| OVERTIME: | Possibility |
| REQUIREMENTS: | |
| CALL # | 6466 |
| CONTRACTOR: | J.W. Koehler Electric |
| # OF JOURNEYMAN WIREMAN: | 1 |
| TYPE OF WORK: | Industrial (Lyondell Basell) |
| TYPE OF CALL: | Long |
| START DATE: | ASAP after background check is cleared |
| HOURS: | 6:30am to 5:00pm working 4-10’s as soon as site requirements are met |
| OVERTIME: | n/a |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Background Check, Safety Shoes, |
| CALL # | 6428 |
| CONTRACTOR: | Tri-City Electric |
| # OF JOURNEYMAN WIREMAN: | 1 |
| TYPE OF WORK: | Commercial / fast paced |
| TYPE OF CALL: | LONG |
| START DATE: | Tues 17th 1:30 TCE shop if needed WED the 18th First day on site |
| HOURS: | 6am to 2:30pm |
| OVERTIME: | Possible |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Steel Toe Boots |
| CALL # | 6468 |