CONTRACTOR: | Ward Electric |
# OF JOURNEYMAN LINEMAN: | 2 |
TYPE OF WORK: | Transmission |
TYPE OF CALL: | Long |
START DATE: | ASAP |
HOURS: | 5-10’s |
OVERTIME: | possible |
REQUIREMENTS: | CDL-A |
CALL # | 6390 |
CONTRACTOR: | Intren |
# OF JOURNEYMAN LINEMAN: | 1 |
TYPE OF WORK: | Outside Construction |
TYPE OF CALL: | Long |
START DATE: | ASAP |
HOURS: | 40 Hours |
OVERTIME: | Possible |
REQUIREMENTS: | CDL-A, Proper I-9 Identification, General Foreman Experience, Subject to Interview, 4-5 week duration |
CALL # | 6465 |
CONTRACTOR: | Sub Surface |
# OF Groundman | 2 |
TYPE OF WORK: | Underground |
TYPE OF CALL: | Long |
START DATE: | ASAP |
HOURS: | 4-10’s |
OVERTIME: | Possibility |
REQUIREMENTS: | |
CALL # | 6466 |
CONTRACTOR: | J.W. Koehler Electric |
# OF JOURNEYMAN WIREMAN: | 1 |
TYPE OF WORK: | Industrial (Lyondell Basell) |
TYPE OF CALL: | Long |
START DATE: | ASAP after background check is cleared |
HOURS: | 6:30am to 5:00pm working 4-10’s as soon as site requirements are met |
OVERTIME: | n/a |
REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Background Check, Safety Shoes, |
CALL # | 6428 |
CONTRACTOR: | Tri-City Electric |
# OF JOURNEYMAN WIREMAN: | 1 |
TYPE OF WORK: | Commercial / fast paced |
TYPE OF CALL: | LONG |
START DATE: | Tues 17th 1:30 TCE shop if needed WED the 18th First day on site |
HOURS: | 6am to 2:30pm |
OVERTIME: | Possible |
REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Steel Toe Boots |
CALL # | 6468 |