CONTRACTOR: | Ward Electric****OPEN |
# OF JOURNEYMAN LINEMAN: | 2 |
TYPE OF WORK: | Transmission |
TYPE OF CALL: | Long |
START DATE: | ASAP |
HOURS: | 5-10’s |
OVERTIME: | possible |
REQUIREMENTS: | CDL-A |
CALL # | 6390 |
CONTRACTOR: | Eilertson****OPEN |
#GROUNDMAN: | 1 |
TYPE OF WORK: | Local 145 jurisdiction |
TYPE OF CALL: | LONG |
START DATE: | ASAP |
HOURS: | 40 hours |
OVERTIME: | N/A |
REQUIREMENTS: | CDL A |
CALL # | 6475 |
CONTRACTOR: | Eilertson****OPEN |
#OPERATOR: | 2 |
TYPE OF WORK: | Local 145 jurisdiction |
TYPE OF CALL: | LONG |
START DATE: | ASAP |
HOURS: | 40 hours |
OVERTIME: | N/A |
REQUIREMENTS: | CDL A |
CALL # | 6476 |
CONTRACTOR: | The Hydaker Wheatlake Co. |
# OF JOURNEYMAN LINEMAN: | 1 |
TYPE OF WORK: | Outside Construction/Substation |
TYPE OF CALL: | Long |
START DATE: | ASAP |
HOURS: | 5-8’s 40 Hours |
OVERTIME: | N/A |
REQUIREMENTS: | Proper I-9 Identification, CDL-A, Experience With Control Wiring and Crane Certs Preferred |
CALL # | 6508 |
CONTRACTOR: | Tri-City Electric |
# OF JOURNEYMAN WIREMAN: | 1 |
TYPE OF WORK: | Industrial/new/dirt work to start |
TYPE OF CALL: | SHORT |
START DATE: | ASAP 1:30 TCE shop if needed First day on site ASAP |
HOURS: | 7-3:30 |
OVERTIME: | Possible |
REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Steel Toe Boots |
CALL # | 6472 |
CONTRACTOR: | Tri-City Electric |
# OF JOURNEYMAN WIREMAN: | 2 |
TYPE OF WORK: | Industrial |
TYPE OF CALL: | Long |
START DATE: | Monday October 7th |
HOURS: | 6am-630pm Monday thru Saturday |
OVERTIME: | Possible |
REQUIREMENTS: | Proper I-9 Identification, Drug Testing, Safety Shoes |
CALL # | 6509 |
CONTRACTOR: | Tri-City Electric |
# OF JOURNEYMAN WIREMAN: | 3 |
TYPE OF WORK: | Industrial |
TYPE OF CALL: | Long |
START DATE: | Monday October 7th |
HOURS: | 6pm-630am Monday thru Saturday |
OVERTIME: | Possible |
REQUIREMENTS: | Proper I-9 Identification, Drug Testing, Safety Shoes |
CALL # | 6510 |