| CONTRACTOR: | Koehler Electric |
| # OF RESIDENTIAL WIREMAN: | 1 |
| TYPE OF WORK: | Residential |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | 7a.m.-3:30p.m. |
| OVERTIME: | n/a |
| REQUIREMENTS: | Steel toed boots, OSHA-10, Proper I-9 identification, Drug testing |
| CALL # | 5188 |
| CONTRACTOR: | Koehler Electric |
| # OF INSTALLER TECHS | 2 |
| TYPE OF WORK: | Commercial |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | Will Vary |
| OVERTIME: | Possibility |
| REQUIREMENTS: | Proper I-9 identification, Drug testing |
| CALL # | 5292 |
| CONTRACTOR: | Tech Solutions |
| # OF INSTALLER TECHS: | 2 |
| TYPE OF WORK: | Commercial |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | Will Vary |
| OVERTIME: | Possibility |
| REQUIREMENTS: | Proper I-9 identification, Drug testing |
| CALL # | 5187 |
| CONTRACTOR: | Allied Power |
| # OF JOURNEYMAN WIREMAN: | 8 |
| TYPE OF WORK: | QC Nuclear plant |
| TYPE OF CALL: | Battery change out. Approx. 5 to 7 weeks |
| START DATE: | August 16th |
| HOURS: | running 3-8 hour shifts |
| OVERTIME: | N/A |
| REQUIREMENTS: | Background Check, Proper I-9 Identification, Drug Testing, Safety Shoes |
| CALL # | 5406 |
| CONTRACTOR: | Rock River Electric |
| # OF JOURNEYMAN WIREMAN: | 8 |
| TYPE OF WORK: | School projects |
| TYPE OF CALL: | Short |
| START DATE: | ASAP |
| HOURS: | 6 – 10’s |
| OVERTIME: | Yes |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification |
| CALL # | 5427 |
| CONTRACTOR: | Electric Doctor |
| # OF RESIDENTIAL WIREMAN: | 1 |
| TYPE OF WORK: | Residential |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | 7a.m.-3:30p.m. |
| OVERTIME: | n/a |
| REQUIREMENTS: | Steel toed boots, OSHA-10, Proper I-9 identification, Drug testing, Iowa license |
| CALL # | 5429 |