| CONTRACTOR: | Allied Power |
| # OF JOURNEYMAN WIREMAN: | 20 |
| TYPE OF WORK: | Industrial @ Quad Cities Nuclear Power Station |
| TYPE OF CALL: | Long |
| START DATE: | will be Depending on How Much Training is Needed to get into the plant |
| HOURS: | 40 Hours |
| OVERTIME: | Possible |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Background Check, OSHA-10, Safety Shoes. If Electronic Personal History Questionnaire is submitted online prior to reporting to the site a $3.50 per hour incentive will be paid during the preoutage window starting 3/16/26 |
| CALL # | 7227 |
| CONTRACTOR: | J.W. Koehler Electric ***** BOOK 1 OR BOOK 2 ONLY |
| # OF JOURNEYMAN WIREMAN: | 3 |
| TYPE OF WORK: | Industrial (Lyondell Basell) |
| TYPE OF CALL: | Long |
| START DATE: | ASAP after background check is cleared |
| HOURS: | 6:30am to 5:00pm working 5-10’s |
| OVERTIME: | Saturdays are optional but some opportunity’s are available |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Background Check, Safety Shoes, |
| CALL # | 7100 |
| CONTRACTOR: | Michels Underground |
| # OF GROUNDMAN TRUCK DRIVER: | 1 |
| TYPE OF WORK: | Outside Bore crew in the Mount Carroll area |
| TYPE OF CALL: | Long call |
| START DATE: | Monday the 16th of March |
| HOURS: | Mon – Thurs 7am-6pm Friday regular 8 hour day |
| OVERTIME: | Possible |
| REQUIREMENTS: | CDL-A with no restrictions, tanker endorsement, OSHA 10 |
| CALL # | 7280 |
| CONTRACTOR: | M.J. Electric |
| # OF JOURNEYMAN WIREMAN: | 8 for days to start. On the 30th it will be going to 4 on days and 4 on nights |
| TYPE OF WORK: | Quad City Nuke plant |
| TYPE OF CALL: | Long call Transformer change out |
| START DATE: | Monday the 23rd of March |
| HOURS: | Working 8’s until March 30th then it will be a 7-12 schedule for the outage. |
| OVERTIME: | Possible |
| REQUIREMENTS: | Safety shoes, I-9 identification, Drug testing |
| CALL # | 7306 |