| CONTRACTOR: | Tri City Electric****OPEN |
| # OF INSTALLER TECHS: | 3 |
| TYPE OF WORK: | Multiple work sites |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | 7am to 3:30pm |
| OVERTIME: | Possible |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Safety shoes. |
| CALL # | 6227 |
| CONTRACTOR: | Tri City Electric |
| # OF JOURNEYMAN WIREMAN: | 4 |
| TYPE OF WORK: | 3M |
| TYPE OF CALL: | SHORT |
| START DATE: | Monday July 15th- Thursday July 18th are the job site dates. Orientation at the TCE shop if needed @ 1:30 ASAP |
| HOURS: | 7/15 – Start time is 7 AM working up to (12) hours 7/16 to 7/18 – Start time is 6 AM working up to (12) hours |
| OVERTIME: | Possible |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Safety shoes. ***ONLINE TRAINING COMPLETED PRIOR TO GOING TO WORK ON THE 15th |
| CALL # | 6374 |
| CONTRACTOR: | Tri City Electric |
| # OF JOURNEYMAN WIREMAN: | 8 |
| TYPE OF WORK: | 3M |
| TYPE OF CALL: | SHORT |
| START DATE: | Monday July 15th- Friday July 19th are the job site dates. Orientation at the TCE shop if needed @ 1:30 ASAP |
| HOURS: | 7/15 – Start time is 6AM working up to (12) hours |
| OVERTIME: | Possible |
| REQUIREMENTS: | Drug Testing, Proper I-9 Identification, Safety shoes. ***ONLINE TRAINING COMPLETED PRIOR TO GOING TO WORK ON THE 15th |
| CALL # | 6375 |
| CONTRACTOR: | Intren |
| # OF GROUNDMAN: | 2 |
| TYPE OF WORK: | Outside Construction |
| TYPE OF CALL: | Long |
| START DATE: | ASAP |
| HOURS: | 7:00am-3:30pm |
| OVERTIME: | Possible |
| REQUIREMENTS: | CDL-A, Proper I-9 Identification, Crew will be responsible to rake, level, add black dirt, and hydroseed excavated areas as needed. |
| CALL # | 6376 |